Daily maintenance of the transformer!

Release date:2018-12-20 17:12:31
In order to protect the insulation performance of the high-voltage generator and the insulating oil installed in the machine head, generally do not open the observation window and loosen the surrounding fixing screws to prevent the oil from absorbing moisture or falling dust and reducing the insulation performance.
 
2. Check the surrounding lighting, heat dissipation and dust removal equipment of the transformer, and wipe off the dust on the low-frequency toroidal transformer body and the porcelain bottle with a clean cloth.
 
3. Check the high-voltage side load switch of the transformer to ensure flexible operation, good contact, and lubrication treatment of the transmission part.
 
4. Pull open the high-voltage grounding knife and check that the grounding is in the disconnected position. Close the high-voltage load switch, let the transformer test run, and remove the high-voltage side identification plate. Pay attention to the high-voltage load switch when disconnecting or closing the transformer. There must be more than two people.
 
5. When it is necessary to replace the new oil, the local power department should be assisted to check the performance of the new oil, and the insulation strength should be no less than 25000 volts / 2.5 mm; and the oil insulation strength in the combined head should be 30,000 volts / 2.5 mm or more.
 
6. Measure the insulation resistance of the high and low voltage coils of the transformer (ground and phase) with a 2500V shaker. Confirm that the requirements are met. (At room temperature 30 °C, the high voltage side of the 1OKV ??transformer is greater than 20MΩ, and the low voltage side is greater than 13MΩ. Before the test, it should be connected. Good grounding wire, after the measurement is completed, it should be discharged.
 
7. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing, and the outer grounding wire are conducting, and tighten the grounding bolt.
 
8. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing and the external grounding wire are conducting, and tighten the grounding bolt.

Article keywords:
QR code
主站蜘蛛池模板: 97碰在线视频 | 欧美日韩中文字幕在线手机版本 | 国产成人一区二区视频在线观看 | 青青热久免费精品视频在线观看 | 成人亚洲精品一区二区 | 欧美在线一二三区 | 日韩免费高清视频 | 99欧美| 久久国产免费福利永久 | 国产最新精品视频 | 欧美 日韩 视频 | 青青草原免费在线 | 欧美日韩一道本 | 国内精品手机在线观看视频 | 爱草视频 | 日韩免费视频网站 | 成人男男黄网色视频免费 | 成人a大片高清在线观看 | 91蜜桃麻豆| aaa免费毛片 | 日本中文字幕一区二区三区不卡 | 国产成人小视频 | 成人性欧美丨区二区三区 | 国产成人一区二区三区视频免费 | 国产一级特黄高清免费大片 | a毛片免费全部在线播放毛 a毛片免费在线观看 | 国产精品福利午夜在线观看 | 成人久久免费视频 | 成人二区 | 欧美日韩不卡 | 精品福利在线 | 久久久久久久性高清毛片 | 国产日韩欧美精品一区 | 国产在线视频一区二区三区 | www视频在线 | 日韩精品一区二区三区中文在线 | 黑人巨大精品欧美一区二区区 | 美国大片黄色 | 99视频免费在线观看 | 欧美成人久久 | 国产精品视频免费播放 |