11 points that must be paid attention to when installing the transformer

Release date:2018-12-20 17:13:54

11 points that must be paid attention to when installing the transformer


1. Reasonably choose the installation location of the distribution transformer:
The installation of the distribution transformer should meet the requirements of the user's voltage, and try to avoid installing the distribution transformer in the barren hills, which is vulnerable to lightning strikes and away from the residential area. This is not convenient for the maintenance personnel to maintain regularly, and it is not convenient for the staff to manage. .
2. Reasonably choose the capacity of the distribution transformer
It is also very important to choose the capacity of the distribution transformer reasonably, which can not cause the load of the distribution transformer to burn out, nor can it cause the waste of the big horse-drawn trolley type. According to the user load situation, the capacity should be counted and the distribution transformer capacity should be reasonably selected.
3. Strengthen the measurement of power load
During the peak period of power load, the load of each distribution transformer should be strengthened. If necessary, increase the number of measurements. The distribution transformer that does not meet the three-phase current should be adjusted in time to prevent the neutral current from being too large and easy to blow the lead. Causes the user equipment to burn out.
4. Avoid installing a low-voltage metering box on the distribution transformer.
The low-voltage metering box installed on the distribution transformer station area of ??the remote mountainous area should be gradually removed, and changed to indoor installation as much as possible.
5, reasonable allocation of distribution transformer high and low temperature melting point electrical melting
The melt distribution of the high and low voltage fuses of the distribution transformer is unreasonable, which may cause serious overload of the distribution transformer and burn out the distribution transformer. The high and low pressure melt configuration shall be followed by: a fuse body with a capacity of 100 kV·A or less and a fuse body with a rated current of 2.0 to 3.0 times; and a transformer with a capacity of 100 kV·A or more with a melt of 1.5 to 2.0 times the rated current; The low-voltage side fuse should be configured slightly larger than the rated current.
6, should not adjust the tap changer privately
Due to the difference in power load between winter and summer, the voltage level is slightly different. In order to meet the voltage demand, some rural electricians randomly adjust the tap changer without performing related tests, causing the tap changer to be out of position, causing phase-to-phase short-circuit and burnout. Electric transformer.
7, distribution transformer high and low installed insulation cover
In order to prevent natural disasters and external damage, if necessary, install high and low voltage insulation covers for the narrow roads and forest protection areas to prevent the low voltage short circuit from burning the transformer on the distribution transformer.
8. Arrest arresters should be installed on the high and low voltage sides of the distribution transformer.
Lightning arresters should be installed on the distribution transformers in the multi-mine area. If the quality of the arrester is unqualified or the fault is not replaced in time, it is easy to be attacked by lightning. During the thunderstorm season, the arrester should be sent to the repair department for testing and timely installation. It is forbidden to use unqualified products.
9. Regularly measure the grounding resistance of the distribution transformer
After long-term operation of the distribution transformer (especially the grounding lead is replaced by aluminum wire), severe oxidation occurs, the grounding resistance increases, and the buried grounding body is rusted and broken, causing the neutral point potential to shift. When lightning strikes or overvoltages , easy to cause an accident. According to the regulations, the grounding device should meet: the grounding resistance of the distribution transformer below 100kV·A is not more than 10Ω, and the grounding resistance of the distribution transformer above 100kV·A is not more than 4Ω.
10. Strengthen daily management
Regularly patrol the line, cut down trees, prevent the branches from hitting the wires and causing a low voltage short circuit to burn the distribution transformer. The lack of daily management of the distribution transformer by the staff makes the transformer run out of oil for a long time. The end of the respirator is installed or the silica gel is not replaced in time, so that the distribution transformer is flooded and easily caused accidents. There are quality problems in the distribution transformer itself. Because the distribution transformer is installed far away, some construction personnel put the untested distribution transformer into operation, temporarily use electricity, and burn out the transformer.
11, regularly check the distribution transformer low voltage lead
It is strictly forbidden to use the wire itself to make the wire nose directly on the low-voltage pile head of the distribution transformer. It is necessary to regularly check and strengthen the joint between the lead wire and the distribution transformer pile head to prevent the low-voltage pile head of the distribution transformer from being burnt due to loosening.

Article keywords:
Previous article:No last one Next article:What are the functional characteristics ...
QR code
主站蜘蛛池模板: 日本一级淫片漂亮的老师一 | 奇米福利视频 | 国产视频大全 | 秋霞一级特黄真人毛片 | 国产成人高清在线观看播放 | 欧美成人免费在线观看 | 国产一区二区在线视频播放 | 韩国一级特黄清高免费大片 | 精品123区| 欧美色欧美亚洲高清图片 | 成人毛片18女人毛片 | 欧美成人午夜精品免费福利 | 欧美日韩在线观看精品 | 黄色激情毛片 | 欧美精品午夜毛片免费看 | 91精品国产一区二区三区左线 | 91成年影院 | 欧美成人精品在线 | 国产最新精品视频 | chinese国产一区二区 | 操干网| 不卡视频一区二区三区 | 国产极品粉嫩福利在线观看 | 国产欧美日韩一区二区三区在线 | a久久久久一级毛片护士免费 | 久久久久久久99精品免费 | 成年人在线视频观看 | 2021国产成人午夜精品 | japan高清视频乱xxxxx | 国产精品一区二区国产 | 欧美伦理一区二区三区 | 超级极品白嫩美女在线 | 99999久爱视频在线观看 | 国产精品成人久久久久 | 激情综合在线观看 | 99久久精品免费看国产情侣 | a一级一色一情 | 国产成人精品综合在线观看 | 国产精品大全国产精品 | 欧美成人黑人视频免费观看 | 日本精品一区二区三区在线观看 |